Current project · Snohomish, Washington

Snohomish Kitchen Remodel

A new kitchen begins with a carefully documented starting point and a clear demolition phase.

Project started and updated November 9, 2026

Follow the project ↓

Project snapshot

Active project

Location
Snohomish, Washington
Project type
Kitchen remodel
Current phase
Demolition complete

01 · Starting point

Document the original kitchen.

The starting photographs show the existing wood cabinetry, counters, appliances, tiled backsplash, sink wall and finish flooring before removal began.

Original Snohomish kitchen with wood cabinetry, granite-look counters, double sink and tiled floor before demolition

Before · Sink wall

The original sink, counter, corner storage and cabinet layout are recorded before demolition.

Original Snohomish kitchen range wall with wood cabinets, microwave and tiled backsplash before demolition

Before · Range wall

The second view documents the original cooking area, upper cabinetry and backsplash.

Why this stage mattersThe original conditions provide a truthful comparison point for the cabinet, floor and trade work that follows.

02 · Demolition

Clear the room for the new kitchen.

The demolition-day photographs show the cabinets, counters, appliances, backsplash and finish flooring removed. Limited wall openings expose the existing framing, insulation and service locations needed to coordinate plumbing, electrical, drywall repair, paint, tile and cabinet installation.

Snohomish kitchen after cabinets, counters, appliances and finish flooring were removed during demolition

Demolition day · Wide view

The cleared room reveals the floor area and the utility locations around the former kitchen layout.

Reverse view of the cleared Snohomish kitchen with utility connections and limited wall openings visible after demolition

Demolition day · Reverse view

The reverse view records the opposite cabinet wall and the limited openings created during removal.

Why this stage mattersDemolition reveals the existing conditions so that cabinet installation, tile-flooring work, and plumbing and electrical work can be coordinated with the actual room.

03 · What comes next

Coordinate the trades and rebuild in sequence.

The planned scope includes coordinated plumbing and electrical work, drywall repair, paint, tile flooring and new kitchen cabinetry. New photographs will be added only after each real stage is documented and approved for public use.

  1. 01Plumbing coordination
  2. 02Electrical coordination
  3. 03Drywall repair
  4. 04Paint work
  5. 05Tile flooring
  6. 06Cabinet installation

One coordinated project

Specialized trade work. One clear client experience.

A kitchen remodel depends on several specialized professionals doing their work in the right order. Plumbing, electrical, drywall, paint, tile and cabinetry each have separate details, but the homeowner should not have to manage the handoffs alone.

Ideal coordinates the schedule, site readiness, trade transitions and visible quality checks so each phase supports the next. That detailed project management helps create a smoother experience for the client while protecting the craftsmanship and high-quality finishes expected in the completed kitchen.

Publication safeguards

The home remains private.

  • Homeowner names and exact address omitted
  • No people or documents shown
  • Location metadata removed from every web image
  • Scope statements limited to confirmed work

Current-project journal

Follow the work—not just the final reveal.

All current projects →

Start with a conversation

Ready to rethink your kitchen?

Share what is not working and what you want your home to feel like. Christian will help identify the next step.