Current project · Ravenna, Seattle
Ravenna Basement Remodel
One home, one basement and one chronological construction story—from the original conditions through the work completed so far.
Start with the home ↓Project snapshot
Active project
- Location
- Ravenna, Seattle
- Project type
- Basement remodel
- Current phase
- Framing complete · Rough-ins next
How to read this page
Move from the home to demolition, structure, concrete, walls and the next trades.
Each of the 32 approved photographs appears once, in the stage where it belongs. The story adds HVAC, electrical, plumbing, drywall and millwork only as those phases are documented.
01 · Home and original basement
Begin with the home and the space as it was.
The exterior establishes which home this story follows without publishing the exact address. The two basement views then document the original slab, laundry area and open depth before demolition began. Thirty-two photographs document one continuous sequence without repeating the same image in an overview and again later.



02 · Demolition
Open the work area in controlled sections.
The original concrete floor was cut, broken and removed in sections. The sequence moves from active breakout to the cleared basement and the tools used to define the work area.



03 · Temporary structural support
Support the house before the next work proceeds.
Yellow temporary posts remained in place while the floor was open and new dimensional lumber was staged. These photographs show the supported work area without making claims beyond the visible conditions.


04 · Sub-slab preparation
Prepare and insulate below the new floor.
Rigid insulation panels were fitted across the prepared floor area and around the stair and visible penetrations before the new concrete slab was placed.


05 · New concrete slab
A continuous new floor takes shape.
The next photographs document the newly placed concrete floor from the main work area, the stair side and the basement entry. A construction laser records a field layout check across the finished surface.




06 · Exterior-wall insulation
Document the perimeter before walls conceal it.
Rigid-foam insulation covers the exterior concrete foundation walls. The sequence follows the long wall, stair area and active work zone before the developing wall layout conceals the assembly.




07 · Framing
The basement rooms become understandable.
The first views show partition walls developing around circulation and visible plumbing locations. The remaining photographs document the completed framing layout, room openings and service areas before rough-in work begins.














08 · Rough-ins and finishes
HVAC, electrical and plumbing come next.
With framing complete, the next documented chapters will follow HVAC, electrical and plumbing rough-ins. Drywall, millwork and finish work will follow after the required coordination, reviews and approvals.
- 01HVAC rough-in
- 02Electrical rough-in
- 03Plumbing rough-in
- 04Drywall
- 05Millwork and finishes
Current-project journal
Follow the work—not just the final reveal.
Start with a conversation
What could your basement become?
Share what is not working and what you want your home to feel like. Christian will help identify the next step.